When Siting for Local Voltage Support First Backfires: The Reactive Power Oversight
You've got a solar farm to interconnect. The utility says voltage drop is the issue—so you site inverters near the load center. Makes sense, right? Bu...
10 articles in this category
You've got a solar farm to interconnect. The utility says voltage drop is the issue—so you site inverters near the load center. Makes sense, right? Bu...
Your distributed generation plan looks solid—until the interconnection study flags the substation. Suddenly, your 5 MW solar farm faces a 2 MW ceiling...
You've modeled Feeder 1 and Feeder 2. Everything looks good—headroom, voltage, protection. So you submit the interconnection request. Then the utility...
The quickest way to get burned in DG siting is picking one number — hosting capacity or circuit load — and treating it like a golden target. You chase...
You've found the perfect spot for your solar farm or battery project. It's close to a substation, land costs are low, and the community seems welcomin...
So you have a shiny new solar farm or battery project in mind. The natural instinct? Find the sunniest patch of land, the windiest ridge, or the cheap...
You spent months on that siting outline. You modeled solar irradiance, wind shear, and load curves. But you didn't account for the storm that kept com...
A few years back, I sat in a room with a team that had just run their siting model. The map lit up with hundreds of viable sites. The developer looked...
Distributed generation (DG) siting sounds like a technical puzzle: find a plot, check the grid, get permits, form. But anyone who has done it more tha...
Here is a story from 2019. A solar developer found a plot in the Central Valley for $500 an acre. Cheapest within fifty miles. They signed fast. Eight...